Palo Alto, CA

Switch and Data - Palo Alto Data Center Expansion

Project overview

This occupied data center expansion included installation of critical power system infrastructure to support 25,000 square feet of existing data  floor and the build out of 16,000 square feet of new data floor. The project included replacement of the utility service and tie-ins to existing critical power and controls systems. This was accomplished with no interruptions to data center operations.

The existing data center and internet switch were maintained in continuous operation throughout this work. This extremely complex project was planned and executed in minute detail using just-in-time delivery scheduling for major materials and equipment in order to minimize traffic impacts in this busy downtown location.

Location
Palo Alto, CA
Services Provided
Design and Build
Size
40,000 Square Feet
General Contractor
Construction Group, Inc.
Engineer
Alfatech
Electrical Contract
$1.8 Million