Santa Clara, CA

McAfee Buildings A, B & C

Project overview

In eight short weeks Redwood Electric Group had the task to design and build McAfee’s new Santa Clara Campus. The project included tenant improvements of eight floors within Building A and two floors in each of Buildings B & C including office space, a gymnasium, café, server room and rack / bench labs. REG performed the electrical as well as the life safety and tele/data cabling systems.

The data installation included in excess of one million feet of category 6 cable was installed with feeds to twelve IDF’s, one MDF, one server room and ten labs. The back bone consisted of category 6a and OM4 multimode fiber for inter-building and OM4 multimode and single mode fiber for intra-building connectivity.

Location
Santa Clara, CA
Services Provided
Design and Build
Size
150,000 Square Feet
General Contractor
DPR Construction
Contract
$3 Million
Completed
October 2010